KONE construction time use solutions

whatsapp chat

Benefits

Less waiting

KONE construction time elevators and KONE JumpLift travel faster than exterior hoists

Optimized logistics

Lower floors enclosed while core construction is going on higher up

Reduce downtime

KONE Care CTU maintenance solutions make sure the elevators are operating optimallY

Cut energy costs

KONE construction time elevators and KONE JumpLifts are much more energy efficient than exterior hoists

Improve safety

With no exterior hoists, the façade can be enclosed sooner and safety is improved

Supporting you at every stage of the construction process

img_Illustrations_Easy step project planning

PLANNING

KONE site planning services ensure the optimum combination of solutions at each stage.

img_illustration_Installation

CONSTRUCTION

With our unique scaffoldless, in-shaft installation method, installation of KONE CTU elevators is faster, safer, and more efficient. And the elevators are ready for use early in the construction process.

img_illustration_Completion

FINISHING

With all vertical transportation taking place inside the building, exterior hoists can be removed and lower floors can be enclosed and finished sooner. We ensure that your equipment will be in perfect condition at handover by performing the final inspection before KONE Care maintenance team takes over.

Tools and downloads

KONE JumpLift

KONE JumpLift makes efficient use of the elevator shaft during the construction phase, whether you're looking to speed up construction schedules, avoid redundant work, or improve logistics.

KONE Construction Time use solutions

Our solutions for construction time use help get workers and materials to the right place at the right time, saving hundreds of valuable hours and speeding up construction schedules.

KONE Care™ CTU Maintenance

KONE Care™ CTU (Construction Time Use) Maintenance ensures that your equipment operates reliably and safely, and minimizes downtime during construction time.

Related topics